BEGIN:VCALENDAR
VERSION:2.0
PRODID:Greensboro, NC Calendar Creator
METHOD:PUBLISH
BEGIN:VEVENT
DTSTAMP:20180109T031834
DTSTART:20120213T153000
DTEND:20120213T183000
SUMMARY:Downtown Greenway Phase 1-B/C & Phase 1-A Mural Workshop
DESCRIPTION:<p>The Greensboro Department of Transportation (GDOT) and Action Greensboro will host this&nbsp;drop-in&nbsp;workshop to provide more information about these projects and to invite the public to share comments.</p><p>Phase 1-B/C includes the remaining portion of southern section of the Downtown Greenway, which runs along Bragg Street from South Eugene Street to East Lee Street at Murrow Boulevard.</p><p>A mural art project is being planned in connection with Phase 1-A and will be located&nbsp;at the Spring Garden Street&nbsp;end of the greenway.</p><p>During this workshop, representatives from GDOT and Action Greensboro will be present to provide details about the project, answer questions, and receive comments. There will be no formal presentation. <a href="https://greensboro2.prod-as.govaccess.org/departments/transportation/metropolitan-planning-organization/bicycle-and-pedestrian/greenways/downtown-greenway" target="_self">Read more</a>.&nbsp;</p>
X-ALT-DESC;FMTTYPE=text/html:<p>The Greensboro Department of Transportation (GDOT) and Action Greensboro will host this&nbsp;drop-in&nbsp;workshop to provide more information about these projects and to invite the public to share comments.</p><p>Phase 1-B/C includes the remaining portion of southern section of the Downtown Greenway, which runs along Bragg Street from South Eugene Street to East Lee Street at Murrow Boulevard.</p><p>A mural art project is being planned in connection with Phase 1-A and will be located&nbsp;at the Spring Garden Street&nbsp;end of the greenway.</p><p>During this workshop, representatives from GDOT and Action Greensboro will be present to provide details about the project, answer questions, and receive comments. There will be no formal presentation. <a href="https://greensboro2.prod-as.govaccess.org/departments/transportation/metropolitan-planning-organization/bicycle-and-pedestrian/greenways/downtown-greenway" target="_self">Read more</a>.&nbsp;</p>
LOCATION:Action Greensboro\, 317 South Elm Street Greensboro\, North Carolina 27401
CLASS:PUBLIC
END:VEVENT
END:VCALENDAR
